Completed Projects
Facilities | |
---|---|
Communications Center Expansion | |
Status: Completed | Updated: May 11, 2015 |
The project will renovate and expand the existing police, fire and 911 facilities at the Thomas Price Service Center. In addition to the physical construction, the existing radio system will be transitioning to the regional Pima County Wireless Integrated Network (PCWIN) radio system.
The new PCWIN radio system will be replacing a 32 year old radio system that has exceeded its service life. This project will incorporate the use of Pima County Bond money and City of Tucson money. The physical construction and expansion will allow dispatchers to operate with the latest dispatch design and equipment as well as providing the addition space for improved operations and training. The overall project completion will provide for radio interoperability with other emergency services in the region. | |
Location: Park and Ajo | |
Reid Park Africa Expansion – Elephant Exhibit | |
Status: Completed | Updated: September 12, 2013 |
See Website for more information. Design and construct a 7-acre expansion of the Reid Park Zoo. This expansion will include connecting pathways from the current zoo footprint, restrooms, drinking fountains, and a 3-acre elephant exhibit and holding facility. This project is a joint effort between the City of Tucson and the Reid Park Zoological Society. | |
Location: Reid Park Zoo | |
Rio Nuevo TCC Arena Renovations | |
Status: Completed | Updated: March 11, 2015 |
Rio Nuevo Multipurpose Facilities District is investing $6M dollars into the Tucson Convention Center (TCC) Arena. Renovations being considered range from restroom improvements, signage / wayfinding including digital signage, concession stand renovations, floor and bowl seats, lighting, audio upgrades, scoreboards, rigging improvements, ice floor improvements and security upgrades. Project scope and budget will be approved by the Rio Nuevo Board and the City of Tucson Mayor and Council.
Funding Sources (as 8/12/13):
Rio Nuevo Multipurpose Facilities District:
Project Budget: $7,840,673
ITD Expenses: $6,206,980
Encumbrances: $1,563,154
City of Tucson for Project Management: Project Budget: $1,010,000
ITD Expenses:$783,266
Encumbrances: $0 | |
Location: 260 South Church Ave., Tucson, AZ 85701 | |
Miscellaneous | |
Central Energy Plant Repairs and Capacity Expansion | |
Status: Completed | Updated: September 12, 2013 |
Replace aging plant equipment and infrastructure to provide continuity of service to Police Headquarters, Fire Headquarters and the TCC Complex. | |
Location: Tucson Convention Center | |
City Public Parking Garage at Plaza Centro | |
Status: Completed | Updated: September 12, 2013 |
Design and construct City owned, Parkwise operated 400 stall public parking garage on city-owned land west of Union Pacific right of way, east of Toole, between Broadway and 4th Av. | |
Location: Broadway and Toole | |
Fire Central | |
Status: Completed | Updated: September 12, 2013 |
The new Fire Central will house Fire Station #1, as well as office space for the Fire Administration and Fire Prevention Departments, a new Fire Fighter’s Memorial Plaza and a Tucson Fire Department History Museum.
Building size: 67,000 square feet
Underground parking: 70,000 square feet
Lot Size: 3.48 acres
Divisions housed at Fire Central:
Fire Administration, Fire Prevention, Public Education, Systems Engineering, Fire Cause, Battalion One HQ, and Fire Station 1
Total staff: 118 employees plus one dog | |
Location: 300 S FIRE CENTRAL PL, near Cushing and I-10 | |
Transportation | |
Cushing Street Bridge | |
Status: Completed | Updated: June 12, 2013 |
The Cushing Street Bridge has been named the "Luis G. Gutierrez Bridge at Cushing Street".
The Cushing Street Bridge construction and roadway improvement project is a vital link in the 3.9-mile Modern Streetcar project. The 320-foot-long ‘signature’ bridge will provide a shaded east-west connection for pedestrians, bicyclists, motorists and transit riders.
When complete, the project improvements will include a new roadway and bridge, asphalt concrete pavement, curb, sidewalk, ramps, driveways, utility relocations and improvements, floodwalls, street lighting and other improvements along Cushing Street, between Avenida Del Convento and the eastbound I-10 frontage road. | |
Location: Cushing Street, W of I-10, to span the Santa Cruz River | |
Houghton Road: Irvington To Valencia | |
Status: Completed | Updated: May 15, 2015 |
This project is part of the RTA Houghton Corridor Improvements that will expand travel capacity and safety in this key north-south regional corridor to accommodate the 2030 traffic demands. Specifically, this project will replace four miles of the existing two-lane roadway with a new six-lane divided desert parkway. The roadway work will include improved intersections with dual left turn lanes, exclusive right turn lanes and upgraded traffic signals; rubberized asphalt for noise mitigation; native landscaping with water harvesting; improved multi-modal access by adding bike lanes on and off the roadway, improving ADA-accessibility and adding sidewalks and multi-use paths, and include bus pullouts and transit options; upgraded drainage and add all-weather crossings, landscaping that enhances the scenic corridor and utilizes water harvesting and incorporates native plants; implement Wildlife-sensitive design features; and bring in Public Art. | |
Location: Houghton south of Golf Links | |
Sun Link Tucson Streetcar | |
Status: Completed | Updated: May 18, 2015 |
An approved four-mile modern streetcar line connecting the University of Arizona to the 4th Avenue commercial district, downtown and the redevelopment area west of downtown. Revenue generating operations are scheduled to begin October 31, 2013.
See latest Streetcar updates from City. - and - UofA Transportation Plan- and - Made in America Video | |
Location: University to Downtown | |
Water | |
Advanced Oxidation Process Treatment Plant | |
Status: Completed | Updated: May 12, 2015 |
As directed by the Mayor & Council, Tucson Water is constructing a 1,4-dioxane treatment system. This system will allow Tucson Water to serve water from the TARP superfund treatment facility that meets the U.S. EPA Drinking Water Health Advisory level for 1,4-dioxane without having to blend the water with other groundwater sources.
This treatment facility will meet the drinking water regulations and will protect Water customer health.
There are two Guaranteed Maximum Price contracts (GMP). GMP1 is $4.3M, which includes chemical feed equipment and GMP2 is $10.3M and includes site work, building, piping, etc. | |
Location: I-19 and Irvington Rd | |
Chloramination Disinfection Facility at the Tucson Water Reclaimed Plant | |
Status: Completed | Updated: May 12, 2015 |
This project is the construction of nitrogen (ammonia) feed system for the reclaimed water system. The new Pima County Waste Treatment Plant provides secondary effluent nearly void of nitrogen (2 ppm). The old Roger Road Treatment Plant provided secondary effluent with high nitrogen levels (around 29 ppm). The Roger Road Treatment Plant is in the process of being closed.
Chloramination (water treatment) has been ongoing at the Tucson Water Reclaimed Plant from the start. With any level of nitrogen chloramination is the best means of water treatment (consultant study) to insure safe water for irrigation and other uses. The nitrogen level of 2 ppm is too low for proper chloramination so a nitrogen source (ammonia) must be installed. This project will provide the equipment, building, piping, and controls to provide that ammonia. | |
Location: 2500 W. Sweetwater Drive | |
Southern Avra Valley Reservoir and Booster Station | |
Status: Completed | Updated: May 18, 2015 |
Construct an 8.5 million gallon potable water concrete lined reservoir along with a booster station having the ability to pump an additional 27.9 million gallons of water per day from the Southern Avra Valley Storage and Recovery Project (SAVSARP).
This reservoir and booster station is a required component of Tucson Water’s SAVSARP. The construction of this reservoir and booster station is required in order for the citizens of the City of Tucson to realize the benefit of the recharge effort in Southern Avra Valley. Utilization of SAVSARP increases the City’s use of a renewable water supply and decreases the City’s dependence on groundwater. | |
Location: Avra Valley |