Contractors, Developers, and Engineers

toddler and drinking fountain

New Services
(new service requests, construction meters, etc.)
Tucson Economic Advancement Center
201 N. Stone Ave.
8 a.m.-4 p.m.
520-791-5164

New Development
(plan review submittals)
310 W. Alameda St.
8 a.m.-4 p.m.
520-791-4718

New Development Plan Review Process

Tucson Water’s goals for new development:

Return 100% of all Master Plan reviews within 30 calendar days of submittal. Return 100% of all Developer Design Plan reviews within 15 calendar days of submittal.

The links below are for developers preparing water plans for new development.

Water Availability Request pdf
Service Area Policy
Overall Water Plan Submittal Process pdf
"OK to Submit" Process pdf
Master Plan Checklist pdf
Instructions for Water Plan Checklist - First Design Review pdf
Water Plan Checklist - First Design Review pdf
General Construction Notes pdf
Cost Estimate & Material Take-Off pdf
Procedure for Revising an Approved Tucson Water Plan pdf
Changing a Plan to Include Phasing pdf
Plan Review Fee Schedule pdf

Utility Plan Review & Roadway Agency Plan Review Instructions

Distribution Design will review utility plans and roadway agency plans for conformance with Tucson Water design standards manual. Plan review submittal should be sent from the utility coordinator, project manger of a roadway agency or utility company. Direct submittal by the design engineer on behalf of the agency/utility company shall include written authorization from the utility coordinator or project manger of roadway agency or utility company. Plan submittal shall include the agency/utility company contact information, project design & construction schedule, cost estimate, plans, specifications, etc. Distribution Design may request additional information to be included with the submittal, depending on the complexity of the project. Send your submittal either by sending a single email with the pdf files attached to TW_DDPlanReview@tucsonaz.gov or deliver your digital media (cd, dvd, etc.) to Tucson Water, Attn: Distribution Design, 310 W. Alameda St., 2nd Floor, Tucson, AZ 85701.

Water System Modification Plan Review Checklist pdf
Water System Modification Plan Review Checklist - Plan Submittal Instructions pdf
Design Standards Illustration (DSI) Plan DSI Autocad Template Files (Files must be saved to your hard drive before opening.)
DSI Template Base (AutoCAD file)
DSI Template Sheets  (AutoCAD file)