Diamond Bell Isolated Water System Fee

This one-time fee, to be assessed at the time of meter application, recovers the capital cost of the water system infrastructure necessary to serve new users connecting to the isolated system.

Tucson’s Mayor and Council held a public hearing on the fee on September 7, 2005, and adopted the fee on September 27, 2005. The fee became effective December 27, 2005.

The fee schedule is shown below.

Meter Size Fee
5/8 inch $2,778.00
1 inch $6,945.00
1-1/2 inch $13,890.00
2 inch $22,224.00
3 inch $44,448.00
4 inch $76,395.00